-
- Posts: 1
- Joined: Tue Feb 02, 2016 8:49 am
This is quite time-consuming but I don't find how to optimize this data processing.
In fact, I would like to have:
- less peaks integrated
- maybe a time-window in which the software can integrate, so the baseline is not influencing the integration
I have already found how to change some of these parameters after a sample has run, but then I need to change these parameters for each sample. It would be easier if this can be automatically done.
Is there someone who can help me to figure this out?
I thank you!
