-
- Posts: 6
- Joined: Tue Jan 06, 2015 4:50 pm
In short I am running a method that is supposed to be 80min long and it is prematurely stopping at 20 min. I double checked the method timetable and sequence table for errors along with instrument component controls to verify the stop time was at 80 min (same as pump).
Normally this machine is used for a 20 minute method so I don't think it is a coincidence that it is stopping at 20 min. I am thinking there is a setting somewhere that is telling it to stop at 20 min, however it has eluded me.
Is there somewhere else where you can control the method run time that I am missing?