- Posts: 8
- Joined: Wed Apr 30, 2014 11:14 pm
We have recently had a Waters rep out and he installed the ICOPS for the 7890B, and was able to get the two systems talking, which is a nightmare. I can run a monitor of the test plot, or back det output, etc and have no problem at all. The second that I tell Empower that there is a column in this machine, it starts throwing Instrument failures and I can't even monitor the system, nor can I perform a test injection. I tried everything, went to the GC and wrote down all the parameters in about every menu I could find, and then went to Empower and made sure that everything matched up. I even tried setting column 1 and column 2 to the same thing and did the same in Empower, and to no avail. My Empower install is super great in that I can't see what the hang up between the two talking is. I was able to set up 3 different comm tests and get the test plot, atmospheric pressure and the back det output without a column, which is an FID without a flame, or just a flat line of zero. I don't know what could be the hangup here. The column I have was on the back inlet and back detector, but I'm planning to use a headspace, which we run manually without Empower controlling. So I did set the injector to none on the main screen of Empower. I'm thoroughly confused as to why I continued to get system failures for hours on end. Even my Empower administrator who knows very little about the GCs didn't have any idea.
I know I described a lot there, but if someone has any ideas about how to get these two systems talking, I would appreciate it.