-
- Posts: 14
- Joined: Tue Mar 12, 2013 1:43 am
It's a 60 m column, id: 0.250 mm, film: 0.15 um. DB-23
With a column this long, I'm going to condition it over night. (Whereas prior to this, I conditioned for 3.5 hours at a high temperature.) Hopefully the baseline settles at this point.
Would love any other suggestions? Thank you!
