Startup procedure after changing rotor seal
Posted: Mon Nov 12, 2012 4:27 am
Hi,
I had to chang the rotor seal in the injection Valve and now I need to startup the whole HPLC system to get the air out of it. Does anyone know how to proceed or can give me a link? I have been looking for a long time but found no description how to proceed.
The HPLC system is from SHIMADZU with the following components:
- LC-20AD pump
- RID-10A detector
- DGU-20A3 solvent degasser
- CTO-20A oven
- 6 position injection valve (Rheodyne) and an Aminex column
I would be very glad if anyone could provide help!
I had to chang the rotor seal in the injection Valve and now I need to startup the whole HPLC system to get the air out of it. Does anyone know how to proceed or can give me a link? I have been looking for a long time but found no description how to proceed.
The HPLC system is from SHIMADZU with the following components:
- LC-20AD pump
- RID-10A detector
- DGU-20A3 solvent degasser
- CTO-20A oven
- 6 position injection valve (Rheodyne) and an Aminex column
I would be very glad if anyone could provide help!