-
- Posts: 6
- Joined: Tue Dec 21, 2010 4:07 am
As per method main peak should be between 15-18 minutes. What changes we should do in mobile phase if RT of main peak is at 12 minutes or if at 19 minutes?
Further if resolution requirement of two peaks is 2 but it is coming 1.6, what modification in mobile phase is required?
Thanks
