Our contractor is installing the GC 590 with 2350A controller. The distance of GC from process line is 30 feet. He installed Genie Prob in the process line and connect its out let with GI pipe 1-1/2" which run toward GC shed. Near GC shed he installed two filters on this 1-1/2" line. The out let of the filters conntect with the GC inlet with 1/4" SS tubing.
Filter Details;
PALL Corporation, Model: T946473-000, Type: MEN 9001G240H, Pressure: 6000 PSIG at 400 deg F, Serial: FN
With Reverse Ultipor Part #: PFS1001ZMH13
Please some one help me with references to explain my management.
I think you understand the issue that GC sample line size is 1-1/2" GI pipe with the heavey duty high pressure filters after the Genie Prob.
I also try to explain the over all arrangement below;
Process pipe line -> Genie Prob -> GI piping -> 2 Filters -> SS Tubing -> GC intet.
My email address is kamran.akhlaq@yahoo.com, you can directly contact me on the given email address. I waiting your kind response on urgent basis.
Thanks
Kamran Akhlaq