Page 1 of 1

Chromeleon 6.8 & multiple peak assigning

Posted: Tue Oct 23, 2018 9:39 am
by chromboy3000
Hi,

I am having an issue with some samples, we report 6 different peaks that elute within a certain timeframe as 'xylenols'. Unfortunately in the case of some samples it is not possible to correctly integrate them in a single integration. This leads me to the issue that I cant get chromeleon to accept that both integrations pictured below are part of xylenols for reporting through LIMS. Is there a solution for this that I am missing or is it a limitation of the software and our method?
http://imgur.com/WLghdgS