Page 1 of 1

Baseline Rise After GC Run

Posted: Wed Aug 22, 2018 11:20 pm
by rw228
Hello Everyone,

I'm beginning to see my baseline rise during my GC cool down phase. After the run stops and my GC vents the hot air from the oven, the baseline drops down like it should then it rises and settles down. The baseline goes back to normal. What would the cause be for this? Is this contamination or a leak? I put a link down below as an example.

https://drive.google.com/file/d/1HZ5p-2 ... sp=sharing

Re: Baseline Rise After GC Run

Posted: Thu Aug 23, 2018 7:40 am
by Rndirk
Does your method runs with constant pressure?