Page 1 of 1

Shimadzu baseline woes

Posted: Thu Mar 02, 2006 3:15 am
by Chris Jones
Hi all,

I changed the hydrogen feeding the FID and this stopped the majority of the baseline rise. It still goes up 500 uV, but at least it's smoother.

Now I have trouble with missing solvent peaks! The column definately has a flow (bubbles through MeOH) and the FID is lit and responding to the odd tap with a pair of forceps. The liner has been changed along with the septa. Even a manual injection of solvent goes nowhere!

What next?
CHRIS