Yeah sure. You don't actually change it in the report itself, think of that as just the formatting that the data is being placed into.
Here is a screenshot of my openlab chemstation data analysis window:
http://i.imgur.com/cYROG.png
Please excuse the crappy placement of the red numbers, just a quick mspaint.
Step 1: open your method, notice that I have the Def_LC.M method open. There are a bunch of different methods you COULD edit (your main acquisition method, the data-file-specific da.m method, a sequence-specific method etc. The one you want is likely in c:\chem32\1\data\[methodname.m]. If you have multiple instruments configured that '1' could be 1, 2, 3, or 4.) If you want this change to occur for all the reports you create for this type of analysis then edit the main method (and if you only want to change the parameters for a specific data file open the da.m in that data file.) You can always re-integrate data, just keep printed or backed up copies of your methods in case you want to restore the original settings. It is always good to keep printed copies of your methods, service engineers and new employees will love you when they can look through historical records of your analysis when problems crop up.
(Step 1.5: open an applicable data file)
Step 2: Click on the integration button.
Step 3: Click on the icon of the pencil writing on the chromatogram OR use the menu at the top of the screen Integration > Integration events
Step 4: Change or add the integration event to the table. To change an area or height reject just change the number next to area reject in the table. For example, if your peaks of interest have area counts of 150 and the noise is like 20 or 30 set the area reject to 75. If you want to add an event, like "turn integration off from 0 to 5 minutes, then turn integration on from 5-15 minutes then turn integration back off' look at the row of buttons near the '5' I placed in the image.
One of the buttons is a row being added, another is being removed. If you mouse over the buttons it will tell you what each one does at the bottom of the screen. Add a couple lines and click the drop down box and look for the parameter called integration, set it to "off" and then set a time. Add another line and repeat until you've set it up the way you would like.
Once you've done this press the button near the '5' in the image that looks like a check mark, that will save the table.
Next you should check to make sure the way you've set things up works. Go to the integrate menu and tell it to integrate, then go to the report menu and print a report. If you need to adjust things refine them until you are happy and then save your changes. To truly save your changes you need to go up to the method menu at the top of the screen and save method.
Let me know if you need any more explanation

.