-
- Posts: 15
- Joined: Fri Jun 20, 2014 4:06 am
instrument : Shimadzu GC-2014 with AutoInjector
head pressure : 15 Psi initially hold for 0.5 min (I am using pressure control mode)
the pressure program is 15 psi hold for 0.5 min
then pressure down to 10 psi hold the rest of the run
inj. Vol: 0.5 uL
Split : 1:50
split Liner : Restek split liner
Column: ZB-WaxPlus (phenomenex, zebron)
30 m: 0.25 mm ID, 0.25 film thickness
temp: 50 C hold for 5 min
then ramp to 200 C at 25C/min
Ethanol RT : 4.6 min
n-propanol: 6.6 min