-
- Posts: 12
- Joined: Fri May 04, 2012 1:15 pm
New enough to this. Ihave set up a calibration curve for ELSD on chemstation. Its not linear but is fitted with a quadratic line. THe thing is that every week, I would like to run a single standard or two instead of a whole new curve. I would then like to adjust the curve based on these two samples. Can anyone run thought how this could be done?
Regards,
JC
