-
- Posts: 16
- Joined: Tue Jun 14, 2011 12:41 pm
I am recieving a "Agilent LC communication error, waiting on single object_timeout" error after starting a sequence. I can control the agilent through empower, no problem but when I hit start in empower, it gives me the error after 20 seconds every time. There is no noise (startup sounds from the autosampler.
Other methods duplicate this error, so it is not method specific. I tried taking offline and back online, no luck.
I tried deleting instrument and re-scanning it from "scan Instruments in the empower nodes section under "systems" no luck
any suggestions?
the stack is 1100 pump, and the rest are 1200 modules. It is connected to Lace box, and everything has been re-booted.
thanks

