-
- Posts: 6
- Joined: Thu Jul 21, 2011 7:16 pm
I've been using Empower for a number of years now, and I have run multiple sample sets consecutively within a project many times. I've never had to run two sample sets associated with different projects back to back. The mobile phases are the same for both methods, but the methods use two different columns, so I'd like to set up:
Project A, Sample set A, Column A
to run back to back with
Project B, Sample set B, Column B
It seems like it should be possible, but I don't quite know how to go about it.
Thanks in advance.