- Posts: 18
- Joined: Mon Aug 31, 2009 9:30 pm
I am using a SRI GC-ECD system but I keep getting this wide round-top peak problem.
The system is: SRI GC-ECD, make up gas is N2 at 60 ml/min, carrier gas is N2. The start up is pretty good with signal less than 200 mv, which is recommended by SRI.
No leaks in the system; tried carrier gas flow rate from 10-20 ml/min; all fittings are as small as possible.
Nothing worked so far to solve this problem.
Can anyone give me some insights? I am out in a field lab and so streessed out now

Thanks!
Emma














 
																							