Chemstation on a GC
Posted: Fri Mar 19, 2010 12:43 pm
We have an Agilent 7890A, when you strt chemstation and the method doesn't match the instrument configuration it asks for confirmation before uploading the method back to the GC.
Is there a way to stop this....I ask because we would like to start using the scheduler.
One column needs a long flush at 200C before the run starts, the run itself is also very long, so it would be nice to automatically start it when no one is around.
But because the oven program temps dont match it allways asks for confirmation...I had a look in the m,acr commands but seem to spot one
Is there a way to stop this....I ask because we would like to start using the scheduler.
One column needs a long flush at 200C before the run starts, the run itself is also very long, so it would be nice to automatically start it when no one is around.
But because the oven program temps dont match it allways asks for confirmation...I had a look in the m,acr commands but seem to spot one