Minimum Resolution required for adequate peak integration
Posted: Sat Dec 26, 2009 4:56 am
I have a method with several impurities, process and degradation products.
We can resolve the impurities but the resolution is not getting any better than 1. Infact, some of them are less than 1.
I use Empower Apex track integration algorithm. All my peaks are integrated based on this algorithm.
Is there a minimum resolution that I need to achieve, inorder to obtain an accurate peak integration.
We can resolve the impurities but the resolution is not getting any better than 1. Infact, some of them are less than 1.
I use Empower Apex track integration algorithm. All my peaks are integrated based on this algorithm.
Is there a minimum resolution that I need to achieve, inorder to obtain an accurate peak integration.