-
- Posts: 176
- Joined: Mon Mar 14, 2005 7:01 pm
You need to have 300mtoor with your Mechanical pump to start the diffusion pump.
With ion gauge, the reading is 4x10'-5 torr
Advertisement
Discussions about GC-MS, LC-MS, LC-FTIR, and other "coupled" analytical techniques.
Because you get a pop-up window from chemstation to set the T of the ion source and quadrupole only after the MS is pumped down (and when the diffusion pump is working). Before that what you have are the previous T of your detector (in your case, ambient T).hi
today i test the pump. its cold. the fluid level is on cold position.
During the automatic pump down process once the MSD starts up,I have the following message <high Vacuum Pump Off, vent in progress> but the pump down process goes on unable to complete it.
if i try to activate the pump down manually from the msd menu (maintenance --->pump down?--->yes) after twenty minutes i have the message <error in pump down>.
Rick, the connection between MSD and Diffusion pump seems to be ok.
bhuvfe, i have had power failures in my lab recently.
during the normal pump down the temperatures are on setpoint. during my pump down the temperatures are 25 Celsius. why?
Too badbhuvfe, i have tried all that you have mentioned before but nothing...
Separation Science offers free learning from the experts covering methods, applications, webinars, eSeminars, videos, tutorials for users of liquid chromatography, gas chromatography, mass spectrometry, sample preparation and related analytical techniques.
Subscribe to our eNewsletter with daily, weekly or monthly updates: Food & Beverage, Environmental, (Bio)Pharmaceutical, Bioclinical, Liquid Chromatography, Gas Chromatography and Mass Spectrometry.