-
- Posts: 11
- Joined: Wed Sep 22, 2010 2:26 pm
n00b of a first post, however:
With the Empower 1 and the delay for next injection setting, does the flow of the method continue?
I want to determine the stability of an analyte in a solution (it is going off rather quick) and want to determine which is the best diluent to use. However I need to validate the method and thus have a documented time frame of events. I would love for the process to be automated where I can tell Empower/waters to inject eg, 20mins, 60mins, 300mins etc after the previous injection. However, is this even possible? I don't want to waste bucket loads of mobile phase while it equilibrates between injections.
Thanks in advance!
