-
- Posts: 1113
- Joined: Wed Dec 22, 2010 10:17 pm
We tend to do a lot of 200:1 injections so that puts a fair demand on the helium line at times if multiple instruments are injecting at the same time.
Obviously FID air requires 400ml/min per FID.
We set the regulators at 80 PSI for the gas lines.