-
- Posts: 49
- Joined: Tue Feb 15, 2005 9:24 am
The 'Remote' connector has the following pin out:
Pin Signal Description
1 DGND Digital ground
2 PREPARE (L) Request to prepare for analysis (for example, calibration,
detector lamp on). Receiver is any module performing
pre-analysis activities.
3 START (L) Request to start run / timetable. Receiver is any module
performing run-time controlled activities.
4 SHUT DOWN (L) System has serious problem (for example, leak: stops pump).
Receiver is any module capable to reduce safety risk.
5 Not used
6 POWER ON (H) All modules connected to system are switched on. Receiver
is any module relying on operation of others.
7 READY (H) System is ready for next analysis. Receiver is any sequence
controller.
I tried connecting the equipment to Pin 1 and 3 (the grey and white wires on the standard cable) but this doesn't work.
Is there a config setting anyone knows about ? Or am I doing something wrong...
Paul.
--
Paul Hurley
