Is this the same thing as "Save Processing Method As Current"? In a QC lab when you need to reprocess a sample set using an old processing method version, surely you can do the same thing by reviewing the relevant result set, and in the calibration tab select Options>Select Calibration, then pick the one from the "Date Calibrated" list which I presume is the same as "Date Processed", then save the processing method as the same name (yes to overwrite).

Would I be right in saying this is the exact same as reprocessing a sample set with a processing method which is updated to Save as Current? I know you get different shape marks on your curve to indicate the new calibration points but does the result set go up a version or what else updates? It seems to be an easier way than reprocessing.