-
- Posts: 21
- Joined: Thu May 22, 2014 6:13 pm
I have a sequence set up to run a specific number of vials for a GC analysis. I have the method set in the method column in the sequence dialog box. We do a calibration of the instrument each day. Right now the method name is the same as I go from calibration to calibration. I'm still going through the set up of the instruments before using it on real samples
My question is if we do the calibration each day what happens with previous data, if I reprocess it on a later date? Will it be reprocessed against current calibration or against the calibration for the day it was run?
If so, should I change the method name to include a date it was used and put in that dated method name into the method column in the Sequence dialog box
How do you deal with this, if you recalibrate on a daily/regular basis?
Thank you.
Christy