-
- Posts: 1
- Joined: Tue Jun 26, 2018 4:04 pm
according to the PhEur and USP, certain mobile phase adjustments are allowed as long as they are within range and the system suitability criteria are met.
Does this apply only to methods listed in the monographs.?
or can it be applied to in-house validated methods, even if it wasn't covered in the robustness during the validation. ?