Hi , injection precision has failed during system suitability testing, and I have to set up a new system. I have time sensitive samples coming out that need to run. As the run time is so long I cannot run full system suitability before injecting samples. Can I run blank, s2, s1 and then the samples if there is nothing in the SOP that states the injection sequence, or that injection precision has to be run at the start of the run.
Thanks
Scio?